Tweet |
Custom Search
|
|
|
||
TM 55-1915-200-SDC
Section V. EMERGENCY POWER OPERATION
9-5. EMERGENCY POWER. In the event of loss of normal power, the Emergency Generator Engine Cranking Panel
will automatically start the emergency generator and energize the emergency switchboard within 45 seconds by use of
ABT (Automatic Bus Transfer) equipment. The following is a list of vital equipment that is fed through the emergency
switchboard and will remain in operation even after normal power is lost.
EQUIPMENT
POWERED FROM
Emergency Generator Air Supply Fan
Emergency Switchboard
No. 2 Air Compressor
Emergency Switchboard
Emergency Generator Room and Steering
Emergency Switchboard
Gear Room Supply Fan
Steering Gear Hydraulic Pump No. 2
Emergency Switchboard
Emergency Fire Pump
Emergency Switchboard
(Aft steering room pump)
Emergency Load Center Panel
Emergency Switchboard
Main Deck, starboard, and Mezzanine
Load Center Panel
Deck, starboard, emergency lights
(Emergency Generator Room)
Steering Compartment, Engine Room,
Load Center Panel
and Control Room emergency lights
Engine Room Control Console for
Load Center Panel
steering and automation system
Emergency Generator Room lights and receptacles
Load Center Panel
Battery charger for emergency generator starting battery
Load Center Panel
Electronics Emergency Distribution Panel "EP1"
Load Center Panel
KY-65 Security Equipment
EP1 (Radio Room)
KY-57 Security Equipment
EP1
Terminal communications HN/UGC-74(Y) 3
EP1
Intercom System LS-519A/SIC
EP1
9-4
|
||