Custom Search
 
  
 
Operation
Open valve
Close valve
Procedure
To heat the pilothouse-continued
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
To heat the captain's stateroom.
(3)
(1)
(4)
(2)
(41)
(42)
To heat the chief engineer's
(3)
(1)
stateroom.
(4)
(2)
(26)
(25)
To heat the passageway.
(3)
(1)
(4)
(2)
(27)
(28)
To heat the crew's mess hall.
(3)
(1)
(4)
(2)
(27)
(28)
To heat the crew's mess hall.
(3)
(1)
(4)
(2)
(21)
(22)
(23)
(24)
To heat the officer's washroom.
(3)
(1)
(4)
(2)
(43)
(44)
To heat the crew's quarters.
(3)
(1)
Set the thermostat in crew's quarters
(4)
(2)
for the desired room temperature.
(47)
To heat the engine room.
(3)
(1)
(4)
(2)
(45)
(46)
To drain the heating boiler.
(2)
(1)
Open the electrical circuit to the
(4)
heating boiler. Allow the boiler to
(3)
cool and the water temperature to
drop to 0
.
When sight glass indicates empty,
close valve (2).
To operate heating coils and tem-
(3)
(1)
perature regulating station in
(4)
(2)
blower room.
(5)
(6)
(7)
(8)
(9)
To bypass temperature regulating
(3)
(1)
station in blower room.
(4)
(2)
(6)
(5)
(9)
(7)
(8)
To operate heating coils and tem-
(3)
(1)
perature regulating station un-
(4)
(2)
der pilot house.
(10)
(11)
(12)
(13)
(14)
2-57


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business