Custom Search
 
  
 
TM 55-1925-204-12
CHAPTER 3
OPERATOR/CREW MAINTENANCE INSTRUCTIONS
Section I. LUBRICATIONS INSTRUCTIONS
3-2. Lubrication Instructions
3-1. General
Refer to the lubrication orders listed below for lubricants
Lubrication of the tug components, assemblies, and
to be used on components named:
auxiliary systems are covered by lubrication orders.
The performance, interval, and type of lubricants are
mandatory.
C91001L
Fuels, Lubricants, Oils and Waxes
LO 55-1925-204-12-1
Tug, harbor, diesel, 1,200 hp, steel, 100 foot, Design 3006, (Flight One)
LO 55-1925-204-12-2
Engine, diesel, marine (Fairbanks-Morse 37-F-16)
LO 55-1925-204-12-3
Steering Device, electric Motor driven (American Engineering Model 5 1/4" Ram).
Air Compressor (2), motor driven, (Quincy Model D340)
LO 55-1925-204-12-4
Capstan, motor driven (New England Trawler Equipment Co. Model R6293)
LO 55-1925-204-12-5
Auxiliary Set (Generator and Fire and Salvage Pump) (GM Engine 4061A, Delco
Generator -3644, Patterson Pump 4LSBB, and Kraissal priming pump 25-9RS)
Lubricating Oil Purifier, motor driven, (DeLaval Steam Turbine Co. Model 45-28).
LO 55-1925-204-12-7
Windlass, motor driven, marine (Markey Marine Co. Model VEV-16)
LO 55-1925-204-12-8
Motor and Pumps, Models A313A143 and A322AX250
Section II. OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Form 2404, used for recording the PMCS, will be
3-2.1. General
furnished to the appropriate supervisor for action. When
Preventive  maintenance  is  the  systematic  care,
all corrected faults have been recorded on DA Form 55-
servicing and inspection of equipment. The purpose of
40 (Deck Department LOG), DA Form 55-44 (Engine
P.M. is to keep the equipment in serviceable condition,
Depart LOC) and all uncorrected faults have been
and to prevent, find and repair conditions that could
transcribed  on  to  DA  Form  2407  (Maintenance
render the equipment unserviceable. The vessel crew is
Request), the DA Form 2404 can be discarded unless its
responsible for operator/organizational
maintenance.
required for historical data.
The engineering/deck personnel engaged in preventive
maintenance checks and services should correct any
3-2.3. PMCS Schedule
deficiencies noted at the time of the check/inspection.
PMCS will be accomplished as outlined in the enclosed
Deficiencies noted that are above the crew level or
table. To ensure that the vessel is serviced and ready
maintenance will be reported to DA/GS level utilizing
fob operation at all times, it will be serviced in
DA Form 2407 (Maintenance Request) in accordance
accordance with the intervals out lines in the PMCS
with TM 38750.
Table.
3-2.2.
Procedures for Preventive Maintenance
1.
Before Operation: The required preventive
Checks and Services.
maintenance  services  will  be  preformed  before
The personnel performing the PMCS will utilize DA
operating. Any deficiencies noted will be corrected prior
Form 2404 (Equipment Inspection and Maintenance
to operating the equipment.
Work Sheet). The form will be annotated in accordance
with para 3-4, Figures, and 3-5 TM 38-750. The DA
Change 1 3-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business