NO.1 DIESEL GENERATOR SET
1.
Ensure engine sump and jacket water cooling levels are at the proper operating levels.
2.
Line-up fuel oil system to allow engine to take suction from and return to stbd day tank by opening valves FO-
15, FO-21 and FO-35 or port day tank by opening valves FO-13, FO-14, FO-21, FO-34 and FO-33.
3.
Line-up cooling system by opening valves FWC-9 and FWC-11.
4.
Prime fuel oil system on engine, if necessary, with engine mounted handpump.
5.
Ensure battery charger is energized and batteries are charged.
6.
Start engine by depressing start button on local control panel or remotely in the EOS. Release start button after
ef1gine starts. For remote start local switch must be in run position.
7.
After engine starts, observe local or remote diesel engine instrumentation to verify proper engine operation.
8.
Allow engine to warm up until all temperatures and pressures have stabilized.
9.
See switchboard operating instructions for placing generator on-line.
10. To secure engine, remove load (see switchboard operating instructions).
11. Allow temperature to cool, approximately 3-5 minutes if engine has been under load.
12. Depress engine stop button on local control panel or remotely in EOS. In EOS, stop button must be held down
until run light goes out.
Placard 14. No. 1 Diesel Generator Set
0067 00-21


 