Custom Search
 
  
 
TM 55-1925-273-10-1
0067 00
OILY BILGE SYSTEM
MODES OF OPERATION:
1.
Primary drainage of bilge pockets to oily waste storage tank is through oily bilge transfer pump.
VALVE LINE-UP: Open OB-14, OB-8, OB-17 and approximate bilge pocket valve.
2.
Transfer from drain tank to storage tank.
VALVE LINE-UP: Open OB-7, OB-14, OB-8 and OB-17.
3.
Oily Water separation is normally from storage tank only.
VALVE LINE-UP: Open OB-16, OB-15, OB-10and OB-17.
OPERATION OF PUMP:
- Ensure built in reservoir is filled with 10 weight motor oil.
-Turn on air supply to pump.
-Monitor pump discharge pressure gauge and duplex suction pressure gauge.
- Turn off air supply to secure pump.
Placard 17. Oily Bilge System
0067 00-25


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business