TM 55-1925-273-10-1
0072 00
7
8
LUBEOIL
FUELOIL
STARTAIR
GM
DATE
ELECTRO-MOTIVEDIVISION
MODEL
LaGrangeIlliniosU.S.A.
ELECTRO-MOTIVE
SERIALNO.
POWER
TOTAL HOURS
ENGINE RPM
TOTALSOUND
ENGINERPM
3
2
ANNUNCIATOR
ENGINE
CONTROL
HEATER
START
POWER
ON
O
ENGINE
HEATER
ON
F
STOP
OFF
F
1
ANNUNCIATOR
ALARM
TEST
ON
ALARM
4
OFF
5
6
Figure 15. Port Main Engine Control Panel
c.
Verify that the ALARM TEST indicator (figure 15, item 4) is illuminated.
d.
Verify that the power ON indicator (figure 15, item 5) is illuminated.
e.
Verify that the ALARM OFF indicator (figure 15, item 6) is illuminated.
f.
Verify that the START AIR pressure gauge (figure 15, item 7) indicates approximately 200 PSI (13.8 bar).
18. On the EOS console, verify that the CONTROL AIR PRESSURE gauge (figure 9, item 3) indicates approximately 125
PSI (8.6 bar).
19. Ensure that the shaft brake pressure gauge (figure 13, item 5) indicates 1200 to 1500 PSI (82.7-103.4 bar).
20. Open the engine top deck covers (figure 13, item 6) and check that the valve train is receiving adequate flow from the
prelube pump. If the flow is adequate, close the engine top deck covers. If the flow is inadequate, notify unit mainte-
nance.
21. Blow down the port main engine by performing the following steps:
a.
Open the test valves (figure 10, item 1) on both sides of the port main engine, approximately inch.
0072 00-14