Custom Search
 
  
 
TM 55-1925-273-10-1
0080 00
m. In the chief engineer's stateroom and sanitary space:
(1) PW-56 (figure 15, item 3), cold potable water to the sanitary space
(2) PW-58 (figure 15, item 4), hot potable water to the sanitary space
n.
In the 01 level passageway:
(1) PW-68 (figure 15, item 5), supply to drinking fountain
(2) PW-62, C.W. TO W.C. (figure 15, item 10)
o.
In the captain's stateroom and sanitary space:
(1) PW-55 (figure 15, item 6), cold potable water to the sanitary space
(2) PW-57 (figure 15, item 7), hot potable water to the sanitary space
p.
In the officer's stateroom #1 sanitary space:
(1) PW-60 (figure 15, item 8), hot potable water to the sanitary space
(2) PW-59 (figure 15, item 9), cold potable water to the sanitary space
q.
In the NCO's sanitary space:
(1) PW-63 (figure 15, item 11), cold potable water to the sanitary space
(2) PW-64 (figure 15, item 12), hot potable water to the sanitary space
REVERSE OSMOSIS UNITS OPERATING PROCEDURE
ELECTRICAL/PIPING LINEUP
1.
At the main switchboard in the EOS, set the following circuit breakers to ON:
a.
AUX MACH SPACE NO.2 PWR PNL NO.5 (figure 1, item 1)
b.
3-25 KVA 1 XFMRS (figure 1, item 4)
2.
At the load center distribution panel, set the 120V DISTRIBUTION PANEL No. 4. circuit breaker (figure 2, item 1) to ON.
3.
At 120V distribution panel No. 4, set the ROWPU BATTERY CHARGER. circuit breaker (figure 4, item 2) to ON.
4.
At the ROWPU battery charger, turn ON the A.C. SWITCH (figure 17, item 1).
5.
At the ROWPU 24 Vdc control panel, set the following circuit breakers to ON:
a.
RO #1 (figure 18, item 1)
b.
RO #2 (figure 18, item 2)
c.
FWF PUMP (figure 18, item 3)
6.
At 440V power panel No. 5, set the following circuit breakers to ON:
a.
REVERSE OSMOSIS WATER MAKER No. 1. (figure 2, item 3)
b.
REVERSE OSMOSIS WATER MAKER No. 2. (figure 2, item 4)
0080 00-14


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business