TM 55-1925-273-10-1
0081 00
Table 2. Valve Alignment for Sewage Holding Tank To Shore Connection (continued)
Item
Valve
Function
Position During Operation
Number
Number
Under Usual Conditions
(Figure 3)
14
MSD-14
MSD DISCH PUMP GAGE ISLN
CLOSED
15
PD-4
WASTE WTR TO SEW HLDG TANK
OPEN
16
PW-100
POTW ISOLATION
CLOSED
17
SD-1
SEWAGE INLET TO MSD
CLOSED
18
SD-2
SEWAGE OVERBOARD DISCHARGE
CLOSED
19
SD-3
SEWAGE DRAIN TO HOLDING TANK
CLOSED
20
SD-4
COV-SEW DISCH PMP NO. 2 SUCT
CLOSED
21
SD-5
COV-SEW DISCH PMP NO. 1 SUCT
CLOSED
22
SD-6
COV-SEW DISCH PMP NO. 2 DISCH
CLOSED
23
SD-7
COV-SEW DISCH PMP NO. 1 DISCH
CLOSED
24
SD-8
SEWAGE OVERBOARD DISCHARGE
CLOSED
25
SD-9
SEWAGE TO SHORE CONN
CLOSED
26
SD-10
SEWAGE SHORE CONN PORT
CLOSED
27
SD-11
SEWAGE SHORE CONN STBD
CLOSED
28
SD-12
MSD OVERBOARD DISCH PMP DISCH
CLOSED
29
SD-13
SEWAGE OVERBOARD DISCHARGE
CLOSED
30
SD-19
SEW PMP NO. 1 DISCH PRESS GAGE
CLOSED
ISLN
31
SD-20
SEW PMP NO. 2 DISCH PRESS GAGE
CLOSED
ISLN
4.
Set to ON the ENGINE ROOM POWER PANEL NO. 1 circuit breaker (figure 1, item 3) at the main switchboard
(figure 1, item 2) in the EOS.
5.
To operate sewage discharge pump No.1 (figure 3, item 39), set to ON the SEWAGE DISCHARGE PUMP No. 1.
circuit breaker (figure 5, item 1) in the 440V power panel No. 1 (figure 5, item 2).
6.
OPEN SD-5 (figure 3, item 21), SD-7 (figure 3, item 23), SD-9 (figure 3, item 25), SD-19 (figure 3, item 30). To pump
to the port shore connection, OPEN SD-10 (figure 3, item 26). To pump to the starboard shore connection, OPEN SD-
11 (figure 3, item 27).
7.
To operate sewage discharge pump No. 2 (figure 3, item 40), set to ON the SEWAGE DISCHARGE PUMP No. 2.
circuit breaker (Figure 5 item 3) in the 440V power panel No. 1 (Figure 5, item 2).
0081 00-7