TM 55-1925-273-10-1
0086 00
a.
To swing the crane to the right, pull the SWING control handle (figure 32, item 1) toward the operator. To swing
the crane to the left, push the SWING control handle away from the operator.
b.
To extend the boom (figure 32, item 6), push the TELESCOPE control handle (figure 32, item 2) away from the
operator. To retract the boom, pull the TELESCOPE control handle toward the operator.
c.
To move the boom (figure 32, item 6) down, push the BOOM control handle (figure 32, item 3) away from the
operator. To move the boom up, pull the BOOM control handle toward the operator.
d.
To raise the block (figure 32, item 5), pull the WINCH control handle (figure 32, item 4) toward the operator. To
lower the block, push the WINCH control handle away from the operator.
CRANE SHUTDOWN
1.
Verify that crane operations have ended.
2.
Perform the Load Moment Indicator (LMI) Shutdown procedure in this work package.
3.
Perform the Central Hydraulic System Hydraulic Power Unit (HPU) Shutdown procedure (WP 0102 00).
WORKBOAT
Operating procedures for the workboat are contained in TM 55-1945-221-14&P and TM 55-1945-224-14&P. Consult these
publications for all workboat operation, PMCS, and maintenance procedures.
LAUNCH THE WORKBOAT
1.
Operate the crane as necessary to position the hook (figure 32, item 7) over the workboat (figure 33, item 1).
2.
Attach the lifting sling (figure 33, item 2) securely to the lift points.
3.
Attach the hook (figure 32, item 7) to the lifting sling ring (figure 33, item 3).
4.
Remove the tie down straps securing the workboat (figure 33, item 1) to the deck cradle.
5.
Operate the crane as necessary to raise the workboat from the deck and move it to the water.
3
2
1
Figure 33. Workboat
0086 00-17


 