SECURE THE AIR CONDITIONING PLANT PIPING SYSTEM
1.
In AMS 2, CLOSE the following valves:
e.
RFAC-39, LIQUID LINE CRVR COV, air conditioning liquid line crossover cutoff, located overhead
f.
RFAC-41, SUCT LINE CRSVR COV, air conditioning suction line crossover cutoff, located overhead
2.
In the main deck fan room, CLOSE the following valves:
a.
RFAC-29, EQL LINE (figure 3, item 1), air conditioning 2 equalizing line
b.
RFAC-30, EQL LINE (figure 3, item 2), air conditioning 1 equalizing line
c.
RFAC-33, TXV/STNR/LLSV COV, R1-25-2, 4 COIL (figure 3, item 3), TXV strainer and low-level cutoff from
air conditioning 2
d.
RFAC-34, TXV COV, R01-32-2 (figure 3, item 4), TXV strainer and low-level cutoff from air conditioning 2
e.
RFAC-36, TXV/STNR/LLSV COV, R1-25-2, 8 COIL (figure 3, item 5), TXV strainer and low-level cutoff from
air conditioning 1
f.
RFAC-37, TXV/STNR/LLSV COV, R1-25-2, 8 COIL (figure 3, item 6), TXV strainer and low-level cutoff from
air conditioning 1
1
4
3
2
5
6
Figure 3. Main Deck Fan Room Air Conditioning Refrigerant Valves
0107 00-5


 