Tweet |
Custom Search
|
|
|
||
TM 55-1925-273-10-1
0107 00
1
3
8
4
2
25 30 35
40
20
15
45
10
50
5
55
0
60
9
6
7
5
Figure 5. Reefer Refrigerant Piping Valves
g.
RFSS-9, EQL LINE (figure 5, item 7), equalizing line
h.
RFSS-6, HAND EXP V (figure 5, item 8)
i.
RFSS-7, HAND EXP V (figure 5, item 9)
SECURE HEATING AND VENTILATION
1.
Position all preheater ON/OFF switches (figure 6, item 1) to OFF.
2.
Position all reheater ON/OFF switches (figure 7, item 1) to OFF.
3.
Position all convection heater power ON switches (figure 8, item 1) to OFF.
4.
Position all space heater ON-OFF switches (figure 9, item 1) to OFF.
5.
At the 01, 02, and pilothouse fan coil, R01-32-2 motor controller, perform the following actions:
a.
Press the STOP pushbutton (figure 10, item 1).
0107 00-7
|
||