Custom Search
 
  
 
TM 55-1925-273-10-2
0137 00
Table 1. Preventive Maintenance Checks and Services Including Lubrication (continued)
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
17
Before
1.5
Unit Heaters
Check that heater mountings are secure.
Heaters do not
Check for obvious damage. Ensure that
operate when turned
heaters operate when they are turned on.
on.
UNIT HEATER
60
50
40
100
PIPING SYSTEMS
18
Before
4.0
Piping
Visually inspect all piping for leaks. Pay
Class III leaks. Any
particular attention to all valves
fuel, coolant, or oil
connections, joints, etc. Correct all
leaks.
leaks or document and report
discrepancies/damage/Class III leakage
to engineer on watch and unit
maintenance.
Piping
0137 00-9


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business