Custom Search
 
  
 
TM 55-1925-273-10-2
0137 00
Table 1. Preventive Maintenance Checks and Services Including Lubrication (continued)
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
HATCHES
74
Weekly
0.5
Overall Condition
Inspect for proper installation, and
check for missing and/or defective
fasteners.
74
Weekly
2.0
Gaskets
Check to ensure that the gaskets properly
Watertight integrity
seal. Perform chalk test. Chalk mark the
or operational
knife edge. Wipe the gasket clean and close
capability is
the hatch.
impaired.
Hatch
Gasket
Quick Acting Dog
Knife Edge
0137 00-34


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business