Custom Search
 
  
 
TM 55-1925-273-10-2
0138 00
Table 1. Preventive Maintenance Checks and Services Chart (continued)
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
94
Weekly
1.0
REDUCTION
Inspect reduction gear cooling pump for
Class III leaks
GEAR COOLING
leaks, loose connections or loose
PUMPS
hardware.
Starboard
Reduction Gear
Electric Motor
Electric Motor
Reduction
Gear Cooling
Pumps
95
Weekly
1.0
FUEL OIL
Visually inspect pumps for leaks, loose
Pumps are
TRANSFER
connections, and damage.
defective.
PUMPS
Fuel Oil
Transfer Pump
Coupling
Electric Motor
Grease
Fitting
Grease Fittings
96
Weekly
0.5
FUEL OIL DAY
a. Check the amount of fuel in the day
TANKS
tanks. Sound the day tanks and
compare the reading to the level
indicated on the tank level indicator.
b. Check for any evidence of fuel
Any fuel leakage
leakage.
c. Transfer fuel (WP 0074 00, volume 1)
as necessary to top off the tanks.
0138 00-37


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business