Custom Search
 
  
 
TM 55-1925-273-10-2
0142 00
Table 1. Preventive Maintenance Checks and Services Chart (continued)
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
5
Weekly
0.3
Inspect stern tube and bulkhead seals for
Shaft Seals
leaks. The maximum allowable leakage is
1 gal/min (3.79 L/min) when vessel
is underway. The maximum allowable
leakage is gal/min (1.89 L/min)
with the boot seal inflated.
6
Weekly
0.3
Starboard Propeller Inspect stern tube and bulkhead seals for
Shaft Seals
leaks. The maximum allowable leakage is
1 gal/min (3.79 L/min) when vessel
is underway. The maximum allowable
leakage is gal/min (1.89 L/min)
with the boot seal inflated.
Shaft Seal Vent
Boot
END OF WORK PACKAGE
0142 00-3/4 blank
0142 00-3


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business