TM 55-1925-273-10-2
0145 00
Table 1. Preventive Maintenance Checks and Services Including Lubrication (continued)
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
2
Before
0.2
Tow Pin Valves
Check hydraulic connections for leaks and Class III leaks or
check lines for damage.
damaged or missing
parts. Fails to
operate properly.
3
After
0.2
Tow Pin Valves
Check hydraulic connections for leaks and Class III leaks or
check lines for damage.
damaged or missing
parts. Fails to
operate properly.
4
Weekly
0.2
Tow Pin Valves
Check hydraulic connections for leaks and Class III leaks or
check lines for damage.
damaged or missing
parts. Fails to
operate properly.
Tow Pin
Tow Pin Valves
Flow Control
Valve
0145 00-2