Custom Search
 
  
 
TM 55-1925-273-10-1
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
OPERATION UNDER USUAL CONDITIONS
FINAL SHUTDOWN
INITIAL SETUP:
References:
Personnel Required:
One Watercraft Engineer, 88L
FINAL SHUTDOWN
1.
Secure the emergency diesel generator (WP 0110 00).
2.
Verify that the vessel is operating on shore power (WP 0111 00).
3.
Secure the ship's service diesel generators 1 and 2 (WP 0111 00).
4.
Verify that all major equipment on the vessel has been properly shut down.
5.
Ensure that an external lighting source, such as a flashlight, is available to all personnel onboard the vessel when
performing this procedure.
6.
Set all circuit breakers and switches to OFF on the panels and switchboards that are listed as follows:
a.
120V pilothouse emergency distribution panel No. 1 (figure 1), located in the 01 level passageway.
Figure 1. 120V Pilothouse Emergency Distribution Panel No. 1
0112 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business