Custom Search
 
  
 
TM 55-1925-273-10-2
0115 00
b.
FM-15, FIRE/G.S. PMP. No. 2 DISCH. TO GS. (figure 1, item 2)
5.
OPEN WWS-1 (figure 2, item 1), located in the main deck vestibule, starboard side, to activate the Engine Room Water
Washdown System (ERWWS).
6.
Operate the ERWWS for a minimum of 15 minutes.
7.
While the ERWWS is operating, OPEN the ERWWS strainer blow off valve (figure 1, item 2) approximately every
three minutes for a period of 10 seconds. This will allow any foreign matter to flush from the inline strainer basket.
8.
Secure the ERWWS by CLOSING valve WWS-1 (figure 1, item 1).
9.
Maintain operation of fire and general service pump 1 as required by current onboard conditions.
1
OFF
JCV-PRO-3
ON
2
Figure 2. WWS Control Station
END OF WORK PACKAGE
0115 00-2


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business