Custom Search
 
  
 
TM 55-1925-273-10-2
0118 00
3.
On the bilge manifold (figure 1, item 3), OPEN the valve for the desired bilge.
4.
Start the pump by completing the following at the fire and general pump No. 1 motor controller:
a.
Press START (figure 5, item 4).
b.
Verify that the MOTOR RUN indicator (figure 5, item 5) illuminates.
5.
When pumping is complete:
a.
Press STOP (figure 5, item 6) at the fire and general service pump No. 1 motor controller.
b.
Verify that the MOTOR RUN indicator (figure 5, item 5) goes out.
c.
CLOSE the bilge suction valve that was OPENED in step 3 above.
d.
CLOSE valve FM-3, S.W. TO BILGE/BLST. PMPS. (figure 2, item 5).
e.
Perform the Secure From Emergency Bilge Pumping procedure in this work package.
SECURE FROM EMERGENCY BILGE PUMPING
1.
Operate the bilge/ballast system under usual conditions (WP 0079 00, volume 1).
2.
Operate the firemain and general service system under usual conditions (WP 0071 00, volume 1).
3.
Return the equipment to the desired readiness condition.
END OF WORK PACKAGE