Custom Search
 
  
 
TM 55-1925-273-10-2
0138 00
Table 1. Preventive Maintenance Checks and Services Chart (continued)
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
32
Before
1.0
BATTERY
a. At 120V emergency distribution panel
CHARGERS
No. 1, turn ON the SSDG No. 1
(SSDG 1,
BATTERY CHARGER. and
MACHINERY DC
MACHINERY DC CONTROL
CONTROL,
BATTERY CHARGER. circuit
ROWPU)
breakers.
b. At 120V distribution panel No. 4, turn
ON the ROWPU BATTERY
CHARGER. circuit breaker.
c. Check battery chargers for proper
connections to battery.
NOTE
A high reading indicates that the batteries
are weak and are being recharged or that
one or more batteries are unserviceable.
d. Check the ammeter reading. The
Unit fails to operate
ammeter should read near 0 for a
and recharge the
trickle charge. If the reading is above
batteries
3 AMPS, refer to unit maintenance.
Battery
Charger
33
Before
0.2
BATTERY BOX
Visually inspect battery box for obvious
Batteries not
damage. Ensure that the vent is not
secured for
obstructed.
operation
Battery
Box Cover
Battery
Wing Nuts
Box
0138 00-13


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business