TB 55-1900-201-45/1
MACHINERY
4.06
MAIN ENGINES AND TRANSMISSION, OVERHAUL AND RECONDITIONING (INDEFINITE) (CONTINUED)
7.
Rocker Arms (on exchange basis)
8.
Thrust Washers
9.
Bearings, Transmission
10.
Bearings and/or Bushings, Starter Motors
11.
Exhaust Valves and Guides
12.
Exhaust Valve Seat Inserts
13.
Injector Tubes
14.
Thermostats
15.
All Seals, Gaskets, Grommets, "O" Rings and Packing
16.
Fresh Water and Raw Water Pump Repair Kits
17.
Fuel and Lubricating Oil Filter Elements
18.
Fuel (for all shop tests)
19.
Lubricating Oils and Greases
20.
Flexible Rubber Hoses and Clamps
21.
Tube Fittings and Tubing (as required)
22.
Pipe Fittings and Pipe (as required)
23.
Zincs
24.
Fastening Material and Keys (as required)
25.
Carbon Brushes
Reassembly:
Reassemble each engine, transmission, assembly, sub-assembly and accessory, furnish and installing
new material as specified and replacing missing or defective fasteners, piping, tubing and fittings.
Maintain all clearances, tolerances and torques as specified by the manufacturer.
Upon completion of reassembly, connect each engine to transmission, service and lubricate as required,
and leave units ready for test.
Test:
Test run each bank of engines and their transmission as a unit on a dynamometer test stand. Test run
shall consist of a fifteen (15) minute warm up period and a four (4) hour continuous run. Gradually increase load
to full power during last hour of test.
Eliminate all oil, water and fuel leaks. Correct all other deficiencies noted during test run.
Figure F-6. Sample Specification Item, LCM-8523 (Indefinite - Engines and Transmissions; 3 of 4)