Tweet |
Custom Search
|
|
|
||
TB 55-1900-231-15
3. Do not turn the cover inside out.
4. During the regular cyclic operation of the equipment or when the vessel is activated and the covers
are stowed in the storage areas in the vessel
(a) All covers will be cleaned and be free of all salt water, grease and other foreign matter. (See
Para F.4. for cleaning instructions)
(b) The covers will be thoroughly dried prior to stowage.
(c) Roll or fold the covers in such a manner (from the top down) to facilitate handling when they
are reinstalled.
H. REVERSE OSMOSIS SYSTEM
1. Engines No. 1 & 2 - 4 Cycle, turbo changed Caterpillar. Each will be processed as follows:
(b) Cooling Systems - Drain, flush/clean, and fill with 50-50 mixture of water and anti-freeze.
(c) Fuel Systems - Change filters, starting with engines hot, run P-9 thru system via fuel supply
and return lines, after which the lines will be reconnected, ensuring no air entrapment, ready for
light off.
(d) Batteries, Starting - In dry state, secured in tray. Cable Tugs and battery post will be coated
with P-11 and left unconnected. The electroyte for the batteries will be stored in the storage
cage on the ROWPU deck of each vessel
Torque converters: fill to operating level with P-10 Grade 30 preservative oil.
Reduction Gear: fill to operating level with GO-90 gear oil (MIL-L-2105)
(f) Drive Belts - Position tensioner in relaxed position.
elbows 180down when the blanks are installed.
2. Pumps, Tubes, Piping, and Filters - Will be flushed with fresh water, and processed as follows:
(a) RIO. Pumps No. 1 & 2 - Drain and blow dry with dry compressed air.
(b) Tubes - Will be drained, the end covers will be removed and left off. The covers with new
CRES securement bolts will be secured to the tube at the end from which they were removed.
NOTE
The membranes have already been removed from the tubes and will not be renewed until
activation.
(c) Piping, Raw and Fresh - will be drained flushed with fresh water and blown dry with dry
compressed air.
E-3
|
||