TB 600-1
SECTION VII
PERFORMANCE TEST
A.
TRAINING OBJECTIVE
TASK:
Each student will be tested on his/her ability to install. perform operator/crew preventive maintenance checks,
and operate the 5KW GED or DED generator set.
CONDITION:
Given a selected site, a load, a 5KW GED or DED generator set, appropriate Technical Manuals and
the necessary tools, materials, and equipment.
STANDARD:
Each student will receive a GO if he/she:
1.
Passes 80 percent of the performance measures.
2.
Passes each performance measure marked with an asterisk (*).
3.
Completes the task within two hours.
B.
ADMINISTRATIVE INSTRUCTIONS
(to be completed by the unit)
1.
When test will be given:
2.
Testing location:
3.
Who will be tested:
4.
Principal and assistant scorers:
5.
Testing station equipment and aids:
a.
5KW GED or DED generator set
1 ea per student
lb.
A load with transmission cable
1 ea per generator set
c.
Ground rod assembly
1 ea per generator set
d.
Sledge hammer or ground rod
hammer
1 ea per generator set
e.
Fire extinguisher
1 ea per generator set
f.
TM 5-6115-332-14, TM 5-2805-
258-14, LO 5-2805-258-12 or
TM 5-6115-584-12, and LO 5-6115-84-12
1 ea per generator set
LO 5-2805-258-12 or TM 5-6115-584-12
and LO 5-6115-584-12
1 ea per generator set
g.
5-gallon can of fuel
1 ea per generator set
h.
12-inch adjustable and 4-inch
flat-tip screwdriver
1 ea per generator set
i.
Clean rags
1 ea per generator set
j.
DA Form 2404
1 ea per student
k.
Pencil 1 ea per student
Change 3 H-26
|
||