TB 600-1
l.
Earplugs or headset
1 ea per student and scorer
m.
Clipboard
1 ea per student and scorer
n.
Wristwatch
1 ea per scorer
o.
Pen
1 ea per scorer
The following can be used:
a.
Load bank
b.
The end item the generator set usually powers
c.
General illumination light set
6.
Testing station personnel.
Scorer
1 each per student
7.
Reference:  TM 5-6115-332-14,
TM 5-2805-258-14, LO 5-2805-
258-12 or TM 5-6115-584-12
and LO 5-6115-584-12.
8.
General Administrative Instruction.
a.
Objective.
To measure the student's ability to:
1.
Install a 5KW GED or DED generator set.
2.
Perform operator/crew preventive maintenance checks.
3.
Properly operate a 5KW GED or DED generator set.
b.
This performance test contains four parts.
PART I
Installing a 5KW GED or DED generator set.
PART II
Perform before operation checks.
PART III
Electric start a 5KW generator set and perform during operation checks.
PART IV
Stopping a 5KW generator set and perform after operation checks.
c.
This performance test contains 75 performance measures. Sixty or eighty percent of the performance measures are
marked with asterisks which are critical performance measures and must receive a PASS.
d.
This test should be conducted outdoors in an open area at least six by eight feet, on level dry ground, during daylight
hours, and in fair weather.