TB 600-1
A.
GASOLINE ENGINE DRIVEN:
TIME STARTED ____________
PART I
INSTALLING A 5KIW GENERATOR SET
PERFORMANCE MEASURES
(Sequence is Scored)
PASS
FAIL
*1.
Installing.  Before attempting to install the generator set, it must be
completely shutdown.
____
____
(Sequence is not Scored)
1.
Site Selection. Uses TM 5-6115-332-12 to install the 5KW generator set.
____
____
*2.
Distance to Load.  Position the generator set and attach the load.  To
prevent voltage line loss, install the generator as close as possible to the
load without disrupting the user.
____
____
*3.
Access.  Provide enough clearance around the generator set to facilitate
operation and maintenance activities.
____
____
*4.
Fuel Supply. Provide an adequate supply of clean fuel to meet requirements
____
____
based on operation time.
5.
Fuel Selector Valve. Place in position depending on fuel source used.
____
____
*6.
Foundation. Place the generator set on reasonably firm dry ground.
____
____
*7.
Mounting. Position the unit so that it is reasonably level and the frame is
supported on its entire bottom surface.
____
____
*8.
Power Transmission Cable. Connect the cable to generator output terminals
for the correct voltage and phase requirements.
____
____
9.
Voltage Phase Output Selector Switch or Change Board. Position the output
selector switch in accordance with the output voltage and phase
____
____
requirement.
*10.
Ground Generator Set. Connect one end of a ground cable not less than
No. 6 AWG to the generator set ground terminal and tighten nut securely.
____
____
Change 3 H-32


 