Custom Search
 
  
 
0040 00
TM 11-5895-1847-12&P
TEST THE AUTOMATIC POWER SWITCH RELAY
1.  Place the GMDSS power supply power switch (5) in the ON position.
35A
FB
REPLACE
REGULATED LINEAR
WITH LIKE
FUSE. SEE
DC POWER SUPPLY
MANUAL
35A INTERMITTENT
15A CONTINUOUS
8A/115V a.c.
4A/230V a.c.
(+) 13.6V d.c. (-)
5
115V
WARNING: REMOVE ALL POWER SOURCES BEFORE
OBTAINING ACCESS TO TERMINALS.
NOTE:
NO USER SERVICEABLE PARTS.
QUALIFIED SERVICE PERSON ONLY.
2C040-2
2.
Place the GMDSS DC converter power switch (6) in the ON position.
POWER
DC-DC CONVERTER
+
25A INTERMITTENT
20A CONTINUOUS
INPUT
20-50V d.c.
_
6
OFF
_
0
OUTPUT
WARNING:
13.6V d.c.
REMOVE ALL POWER SOURCES
+
BEFORE OBTAINING ACCESS TO
TERMINALS.
2C040-3
3.
Place the automatic power switch alarm mode switch (3) in the lamp and buzzer (up) position.
4.
While observing the meter on the automatic power switch (2), move the GMDSS power supply power switch (5)
to the OFF position.
5.
Ensure that the voltage indication on the automatic power switch drops off and then returns to the original position
and the lamp (1) lights and the buzzer sounds.
6.
Place the GMDSS power supply power switch (5) in the ON position.
END OF WORK PACKAGE
0040 00 2


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business