Custom Search
 
  
 
TM 11-5895-1847-12&P
OPERATOR AND UNIT MAINTENANCE
LCU 2000 GLOBAL MARITIME DISTRESS AND SAFETY SYSTEM
TROUBLESHOOTING PROCEDURES
INITIAL SETUP:
Tools
General Mechanics Rail and Marine Tool Kit (Item 4, WP 0166 00)
Personnel Required
Seaman 88K
Equipment Condition
AC Generator Operating.
TROUBLESHOOTING PROCEDURE
COMMUNICATION AN/PSN-11(V)1 PRECISION LIGHTWEIGHT GLOBAL POSITIONING RECEIVER
(PLGR) HAS NO POWER
SYMPTOM
No indication of power displayed in the PLGR display window.
MALFUNCTION
No power to PLGR.
CORRECTIVE ACTION
Turn PLGR on. Press the ON button on the PLGR.
SYMPTOM
Check power switch on the AN/PSN-11(V)1 interface and switchbox.
MALFUNCTION
Power switch is in the OFF position.
CORRECTIVE ACTION
Turn power switch to on PWR position.
0057 00 1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business