Custom Search
 
  
 
TM 11-5895-1847-12&P
OPERATOR MAINTENANCE
LCU 2000 GLOBAL MARITIME DISTRESS AND SAFETY SYSTEM
REPLACE AN/PSN-11(V)1 PRECISION LIGHTWEIGHT GLOBAL
POSITIONING SYSTEM RECEIVER (PLGR) INTERFACE CABLE
INITIAL SETUP:
Tools
General Mechanics Rail and Marine Tool Kit (Item 4, WP 0166 00)
Materials/Parts
Electrical Cable Assembly
50-200027
Personnel Required
Engineer 88K
Equipment Condition
Power Off at Interface and Switchbox. (WP 0023 00) (WP 0030 00)
REMOVE PRECISION LIGHTWEIGHT GLOBAL POSITIONING SYSTEM RECEIVER (PLGR)
INTERFACE CABLE
1.
Disconnect Global Positioning System (GPS) interface cable (1) from switchbox (2).
6
2
5
1
4
3
2C127-1
a.
Grasp the GPS interface cable connector (3) and turn counterclockwise to remove from J-7 connector (4) on
switchbox (2).
b.
Disconnect interface cable connector from J-7 connector.
0103 00 1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business