TM 5-1940-277-10
TM 1940-10/1
PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B - Before Operation D - During Operation
A - After Operation
W - Weekly
EQUIPMENT
ITEM INTERVAL
ITEM TO BE INSPECTED
IS NOT READY/
NO.
PROCEDURE
AVAILABLE IF:
BDA W
25
Horn (43). Press the large button and keep your finger on the but-
ton. The horn should continue to sound. Take your finger off the
button and the horn should stop. If horn does not stop, turn off
master switch and report it to unit maintenance.
26
Rub Rail (44). Check port and starboard rub rails for missing or
tom sections. Report problems to unit maintenance.
2-33