Custom Search
 
  
 
TM 5-1940-277-10
TM 1940-10/1
b.
Assistant boat operators. Prepare bays for joining on raft. When boat operator has bay in position, pass lines or
boat hooks across yap and pull bays together. Connect bay to bays on raft centerline by closing deck connectors
and tightening lower lock drives by turning them clockwise with T-wrench until lower lock drive seats all the way.
Secure bank side bay to the bank with at last 2 approach guys. (Refer to TM 5-5420-209-12.)
2-95


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business