Custom Search
 
  
 
TM 51940-277-20
TM 1940-20/2
12. Using 18 mm open end wrench install split coupling (4) to secure cable.
13.
Place scoop in FULL FORWARD position and slide control rod (19) onto crank Using 13 mm box wrench install
self-locking nut (1).
14.
Check scoop linkage adjustment (refer to paragraph 3-35).
15.
Close hydrojet hatches (refer to paragraph 3-154).
3-61


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business