Tweet |
Custom Search
|
|
|
||
TM 51940-277-20
TM 1940-20/2
12. Using 18 mm open end wrench install split coupling (4) to secure cable.
13.
Place scoop in FULL FORWARD position and slide control rod (19) onto crank Using 13 mm box wrench install
self-locking nut (1).
14.
Check scoop linkage adjustment (refer to paragraph 3-35).
15.
Close hydrojet hatches (refer to paragraph 3-154).
3-61
|
||