Tweet |
Custom Search
|
|
|
||
TM 5-1940-277-20
TM 1940-20/2
INSTALL:
1.
Install fan (31) and pulley (32) on shaft (30) with washer (33) and locknut (34).
2.
Install wiring harness and grommet (14) on alternator cover (18).
3.
Connect lead wire (27) on terminal (26).
4.
Connect lead wire (24) on terminal (25).
5.
Connect lead wire (22) on terminal (23).
6.
Using 10 mm wrench install lead wires (29) and (20), on posts (28) and (21), with two nuts (19).
7.
Position alternator cover (18) on alternator (13).
8.
Using flat tip screwdriver install alternator cover (18), washers (17), and lockwashers (16), with two
screws (15).
9.
Using 13 mm wrench install support bracket (5) on thermostat housing (6) with four screws (2).
10.
Using 13 mm wrench and 15 mm wrench install alternator (13), bolt (1), sleeve (3), and nut (4) on
support bracket (5).
11.
Using 10 mm wrench and 13 mm wrench install support brace (9) on engine water inlet
connection (10) with screw (8), and nut (7).
12.
Using 10 mm wrench and 13 mm wrench install support brace (9) on alternator (13) with
screw (12) and nut (11).
13.
Install drive belt (refer to paragraph 3-119.1).
14.
Install belt guard (refer to paragraph 3-119.1).
15.
Connect battery ground cable (refer to paragraph 3-90).
16.
Close battery hatch.
17.
Close engine hatches.
3-204.3
Change 2
|
||