Tweet |
Custom Search
|
|
|
||
TM 5-2010-205-14
4-58. REPLACE BATTERY ASSEMBLY
This Task Covers: a. Inspect
b. Service
c. Replacement
IN1TIAL SETUP
Tools Required
Equipment Conditions
Tool Kit, General Mechanics
Engine Shutdown (para 2-11).
(Appendix B, Item 1)
Personnel Required
Materials/Parts Required
1 Person
Cotton Rags (Appendix E, Item 3)
INSPECT (Figure 4-48).
1. Inspect for loose bolts (8).
2. Inspect for loose cable connections (5).
SERVICE
1. Remove lids (3).
2. Add water flush with cell top.
3. Replace lids.
REPLACEMENT
CAUTION
Remove negative cable first and install negative cable last.
1. Loosen connections (5).
2. Remove cables from batteries (2).
3. Remove batteries from battery box (1).
4. Loosen and remove nuts (9), lockwashers (7), bolts (8), and flat washers (6).
5. Remove battery box (1).
4-108
|
||