Tweet |
Custom Search
|
|
|
||
TM 5-2010-205-14
NOTE
The upper bearings have the oil hole.
12.
Install bolts (4) and washers.
13.
Tighten bolt (9) to 30 lb.ft.
14.
Tighten bolt (8) to 30 lb.ft.
15.
Turn bolt (9) 120 degrees more.
16.
Turn bolt (8) 120 degrees more.
17.
Remove gear from crankshaft.
18.
Install crankshaft gear key so it is even with end of crankshaft.
19.
Heat crankshaft gear to a maximum of 500 degrees F.
CAUTION
Timing mark on gear must be toward pulley end of shaft.
Figure 6-8. Crankshaft Main Bearings
6-28
|
||