Custom Search
 
  
 
TM 55-1905-219-14-1
Table 2-1. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - continued
Location
Item
Item to Check/
Not Mission
No.
Interval
Service
Procedure
Capable :
NOTE*
51
Continued
It is recommended that new
engines be started with 100-
hour  oil  change  periods.
Establishment  of  the  most
practical  oil  change  period
should be based on results of
oil sample analysis.
52
HOURLY
Engine Room
GENERATOR ENGINE.
*Hourly usage
exceeds 250
and/or when oil
ENGINE OIL CHANGE. Pump engine oil
into a suitable container through dipstick hole
sample analysis
(10).
indicates need
for action.
NOTE*
It is recommended that new
engines be started with 100-
hour  oil  change  periods.
Establishment  of  the  most
practical  oil  change  period
should be based on results of
oil sample analysis.
NOTE
Do not drain oil into bilges. Use
the oil/water separation system
to collect drained oil.
NOTE
Use rotary hand dispensing
pump NSN 4930-00-263-9880.
Change 4 2-115


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business