Custom Search
 
  
 
TM 55-1905-219-14-11
6-1. PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
b. Bolts
Draw flange together
(15),
and install.
nuts
(14),
and
cotter
pins-
(13)
c. Lockwire
Install.
(12)
6-19


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business