Custom Search
 
  
 
TM 55-1905-219-14-11
6-1. PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
Draw together.
(18), and
stub shaft
(16)
e. Bolts (8),
Install.
nuts (7)
and
cotter
pins (6)
f. Lockwire
Install.
(5) , and
outboard
shaft
sleeves
(11)
g. Fairwater
Install.
cones (10)
and screws
(9)
h. Outboard
Install.
shaft
sleeve s
(4)
i. Chain
Remove.
j. Fairwater
Install.
cones
(3), and
screws
(2)
k. Rope guard
Install.
(1)
l. Lifting
Remove.
eye pads
6-20


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business