Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-2
2-40. REMOTE OPERATION - GENERATOR #2 (Cont)
(2)
Place generator 2/shore power voltmeter switch (2) in the GEN 2 position.
(3)
Observe voltmeter (3). It should read 450V. If not adjust the voltage adjust rheostat (4).
(4)
Place the frequency meter switch (5) in the generator #2 posit ion.
(5)
Observe frequency meter (6). It should read 60 hz. If not adjust the governor motor switch (7).
Shore power is being supplied to the vessel. Shore power indicator (8) is lit
and circuit breaker (9) is in the ON position.
To avoid the possibility of damage to the generator, when indicator (8) is lit:
Circuit breaker (9) must be in the OFF position, before placing circuit breaker
(10 and 11) in the ON position.
(6)
Place the shore power circuit breaker (9) In the OFF position.
NOTE
Shore power indicator (8) will remain lit.
(7)
When the generator is at 450V and 60 hz, place the generator 2 main circuit breaker (10) in the ON position.
(8)
Place the distribution bus circuit breaker (11) in the ON position.
(9)
Place the auto/manual switch (12) in the AUTO position.
2-280
|
||