Custom Search
 
  
 
TM 55-1905-219-14-4
3-54. LINE SHAFTING (PORT SIDE ONLY) - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
DISASSEMBLY (Cont)
2. Remove cotter pin (30).
3. Remove shaft nut (31).
4. Remove coupling half (6).
5. Remove shaft keys
(32 and 33) from
shaft (34).
7. Forward
a. Coup-
1. Slide coupling half (23)
engine
ling
aft about 6 Inches (15 cm)
room, Port
half
side
2. Remove cotter pin (35).
3. Remove shaft nut (36).
4. Remove coupling half (23).
5. Remove shaft keys (37 and
38) from propeller line
shaft (34).
6. Slide gland stuffing
box (26) off shaft.
3-988


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business