Tweet |
Custom Search
|
|
|
||
TM 55-1905-219-14-4
3-54. LINE SHAFTING (PORT SIDE ONLY) - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
8. Aft engine
a. Pro-
1. Lift and slide the
Use chain
room, port
peller
propeller line shaft
hoists. The
side
line
(34) out of bulkhead.
shaft weighs
shaft
shaft
388 lbs (176
kg).
2. Slide gland stuffing
box (29) off of the
shaft.
3. Remove propeller line
shaft (34).
3-989
|
||