Custom Search
 
  
 
TM 55-1905-220-14-11
6-1.
PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
b. Bolts
Draw flange together
(15),
and install.
nuts
(14),
and
cotter
pins
(13)
c.
Lockwire
Install.
(12)
6-19


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business