Custom Search
 
  
 
TM 55-1905-220-14-11
6-1.
PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS
(Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
Draw together.
(18), and
stub shaft
(16)
e. Bolts (8),
Install.
nuts (7),
and
cotter
pins (6)
f.
Lockwire
Install.
(5), and
outboard
shaft
sleeves
(11)
g.
Fairwater
Install.
cones (10)
and screws
(9)
h. Outboard
Install.
shaft
sleeves
(4)
i.
Chain
Remove.
j.
Fairwater
Install.
cones
(3), and
screws
(2)
k.
Rope guard
Install.
(1)
l.
Lifting
Remove.
eye pads
6-20


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business