Custom Search
 
  
 
TM 55-1905-220-14-2
2-65.
PRELIMINARY ADJUSTMENTS (Cont).
(6)
Flow control valves (FO-36) can be adjusted to control the speed of operation.
(8) and (9) Stern Gate - Starboard raising and lowering speed.
(10) and (11) Stern Gate - Port raising and lowering speed.
NOTE
Valves (8) and (9), (10) and (11) must be balanced so that both sides of the Stern Gate raise and lower together.
2-471


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business