TM 55-1905-220-14-2
2-156.
PREPARATION FOR MOVEMENT.
a.
The landing craft can be moved on various types of crafts.
b.
The craft can be lifted for transport on a major cargo ship.
c.
The craft can be docked in a conventional dry dock, or a landing ship dock (LSD).
d.
The following is an index to the procedures:
DESCRIPTION
PARAGRAPH
Lifting of Land Craft
Docking
2-158
2-157.
LIFTING OF LANDING CRAFT.
a.
Lifting of the landing craft can be done by either:
a 200 long ton (203.metric ton) crane.
two 100 long ton (101.5 metric ton) cranes.
b.
Attach lifting sling as shown using 4-1/2 diameter pins in the deck lifting pads.
Change 4
2-743