Custom Search
 
  
 
TM 55-1905-220-14-2
2-163. CONNING TOWER AND RAILINGS (CONT)
(i)
Remove gasket (2) from base of join of tower to house top. Stowe.
(j)
Protect navigation horn on starboard side of the tower from accidental damage.
(2) To install the conning tower, proceed as follows:
As soon as the securing cabling has been removed and the lifting cabling
attached, all personnel in the vicinity must clear the area.
Do not attempt to install conning tower in the wind. It may be damaged.
NOTE
This procedure requires 2 men.
(a)
Attach cabling to each lifting eye on top of the c nning tower.
o
Change 4
2-750.1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business