Custom Search
 
  
 
TM 55-1905-220-14-2
2-163. CONNING TOWER AND RAILING (CONT)
(b)
Attach other end of cables to the lifting crane.
(c)
Keep cabling under slight tension during next step.
(d)
Loosen and remove the tiedown cabling and all protective material under the cables. Clear the area to
a safe location.
(e)
With the crane, lift the conning tower and place on top of pilothouse, with sliding doors facing astern.
(f)  Line up the screw holes on bottom of tower with s rew holes on top of pilothouse, first having placed
c
the gasket (2) between the screw holes of the tower and the pilothouse.
(g)
Secure tower to pilothouse with the 32 screws and nuts (1).
(h)
Remove cables from lifting eyes and crane from tower area.
(i)
Reinstall searchlight to roof of conning tower by referring to paragraph 2-167.
(j)
Connect electrical wiring and ducting to the outlets.
(k)
Remove protective covering from navigation horn on starboard side of tower.
Change 4
2-750.2
All data on page 2-751 deleted.


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business