Custom Search
 
  
 
TM 55-1905-220-14-4
3-52.3. HYDROSTARTER SOLENOID - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
REMOVAL
5. Hand pump
Bleeder
Release pressure in the
screw
hydrostarter system by
valve
opening the bleeder screw
valve on side of pump
approximately 1/2 turn.
WARNING
The oil pressure in the system must be released prior to servicing the solenoid
valve or any other components of the system to prevent possible injury to
personnel or equipment.
6.
Supply pipe
Disconnect supply pipe.
7.
Return pipe
Disconnect return pipe.
8.
Solenoid
a. Disconnect electrical
housing
connections.
3-951


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business