Custom Search
 
  
 
TM 55-1905-220-14-4
3-54. LINE SHAFTING (PORT SIDE ONLY) - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
14. Forward
a. Propel-
1. Install lantern ring
engine
ler line
(41), preformed pack-
room,
shaft
ing (40) and gland
port side
stuffing box (26).
2. Slide gland stuffing
box (26) onto propeller
line shaft (34).
b. Coup-
1. Install key shafts (37
ling
and 38).
half
2. Install coupling-half
(23) onto propeller line
shaft (34).
3. Install shaft nut (36)
and cotter pin (35).
15. Aft
a. Coup-
1. Install key shafts
engine
ling
(32 and 33).
room,
half
port side
(6)
2. Install coupling half (6).
3. Install shaft nut (31).
4. Install cotter pin (30).
b. Propel-
1. Lower, and slide propeller
ler line
line shaft (34) forward.
shaft
2. Remove chain hoists.
c. Pillow
1. Install felt seals (17),
block
and (18).
2. Replace top of pillow block
(10).
3. Install lockwashers (9),
Hand tight.
and hex nuts (8).
3-974


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business