Tweet |
Custom Search
|
|
|
||
TM 55-1905-220-14-4
3-54. LINE SHAFTING (PORT SIDE ONLY) - MAINTENANCE INSTRUCTIONS (Continued)
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
4. Install retaining ring
(16), lockwashers (15)
and bolts (14).
5. Install retaining ring
(13), using lockwashers
(12) and bolts (11).
d. Gland
1. Push gland stuffing
stuffing
box (29) and preformed
box
packing (39) up tight
against bulkhead plate
insert (45).
2. Install hex nuts (28)
and jam hex nuts (27).
3-975
|
||