Tweet |
Custom Search
|
|
|
||
TM 55-1905-220-14-4
3-54. LINE SHAFTING (PORT SIDE ONLY) - MAINTENANCE INSTRUCTIONS (Continued)
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
16. Forward
a. Gland
1. Install gland stuffing
engine
stuffing
box (26), preformed
room,
box
packing (40), and
port side
lantern ring (41).
2. Install hex nuts (25)
and jam hex nuts (24).
b. Coup-
1. Draw together coupling
Align at
ling
halves (22 and 23).
punch marks.
halves
2. Install capscrews (21),
Finger tight.
and lockwashers (20).
Insert cotter
pins (19) af-
ter alignment.
17. Aft
a. Coup-
1. Draw together coupling.
Align at
engine
ling
halves (6 and 7).
punch marks.
room,
halves
port side
2. Install capscrews (5)
Finger tight
and lockwashers (4).
only. Insert
cotter pins
(3) after
alignment.
b. Pillow
Tighten hex nuts (8)
block
and lockwashers (9),
securing pillow
block halves (10).
c. Shaft
1.
Install shaft guard
After align-
guard
(2) over coupling
ment is com-
halves (6 and 7).
plete.
2. Install screw (1),
securing shaft guard
to deck plate.
3-976
|
||